水电站施工组织设计(全英文)

发表于2006-04-06     1610人浏览     4人跟帖     总热度:10  

水电站施工组织设计(全英文)

分享至

分享到微信朋友圈 ×

打开微信"扫一扫",扫描上方二维码
请点击右上角按钮 ,选择 

奖励      

  • 奖励于 2006-04-07 02:51:11

 发表于2006-04-06   |  只看该作者      

2

没有搜索到英文的,楼主的这个资料是第一次在筑龙里出现吗??

奖励      

  • 奖励于 2006-04-07 03:01:01

 发表于2006-04-07   |  只看该作者      

3

这个资料是第一次在筑龙里出现.

奖励      

  • 奖励于 2006-04-07 21:05:18

 发表于2006-04-07   |  只看该作者      

4

TABLE OF CONTENTS
TABLE OF CONTENTS 1
1. A SURVEY OF THE PROJECT 1
1.1. A BRIEF INTRODUCTION 1
1.2. ENGINEERING GEOLOGICAL, HYDROGEOLOGICAL AND METEOROLOGICAL CONDITIONS 1
1.3. CONDITIONS OF COMMUNICATIONS TO THE OUTSIDE 4
1.4. SCOPE OF THE PROJECT 6
1.5. MAIN VOLUME OF WORKS FOR THE CONTRACT (CONTRACT A) 7
1.6. Requirements for Construction Schedule of Contract A 8
2. CONSTRUCTION ORGANIZATION 9
2.1. PROMISE FOR CONSTRUCTION 9
2.2. ON-SITE ORGANIZATION 11
2.3. MAIN MANAGEMENT PERSONNEL TO BE DISPATCHED FOR THE PROJECT 13
2.4. CONSTRUCTION MANAGEMENT 15
3. CONSTRUCTION MASTER PLANE LAYOUT 24
3.1. LAYOUT PRINCIPLE 24
3.2. CONSTRUCTION ROAD IN THE SITE AREA 24
3.3. STOCKYARD SELECTION AND EXPLOITATION 27
3.4. SAND AND STONE PRODUCTION SYSTEM 33
3.5. CONCRETE PRODUCTION SYSTEM AND TRANSPORTATION 39
3.6. MECHANICAL MAINTENANCE SYSTEM 41
3.7. OTHER CONSTRUCTION PLANTS 42
3.8. STACK YARD FOR METAL STRUCTURE PROCESSING AND MECHANICAL-ELECTRICAL EQUIPMENT 44
3.9. WAREHOUSING SYSTEM 44
3.10. DISCARD SLAG FIELD 45
3.11. WIND, WATER, ELECTRICITY AND COMMUNICATIONS SYSTEM 45
3.12. OFFICE AND LIVING FACILITIES 48
3.13. ENVIRONMENTAL PROTECTION MEASURES FOR LIVING, PRODUCTION AND CONSTRUCTION AREAS 49
3.14. SUMMARY OF THE ENGINEERING VOLUMES FOR OTHER TEMPORARY PROJECTS 51
4. CONSTRUCTION DIVERSION AND WATER FLOW CONTROL 53
4.1. CONSTRUCTION DIVERSION PLAN AND NAVIGATION REQUIREMENTS 53
4.2. DESIGN OF COFFERDAM 56
4.3. COFFERDAM SEEPAGE CONTROL 62
4.4. COFFERDAM ENGINEERING CONSTRUCTION 70
4.5. FOUNDATION PIT DEWATERING 78
4.6. DEMOLISHING OF COFFERDAM 79
4.7. SCHEME FOR TEMPORARY BLOCKING OF PLANT HOUSE INTAKE AND TAILRACE OUTLET 80
5. OPEN-CUT EARTH AND ROCK EXCAVATION 81
5.1. FIRST STAGE FOUNDATION PIT EXCAVATION 81
5.2. FOUNDATION PIT EXCAVATION FOR THE SECOND STAGE PROJECT 92
5.3. BALANCE OF EARTHWORK AND STONEWORK 93
5.4. EARTH AND ROCK FILLING CONSTRUCTION 95
6. Engineering construction of concrete 103
6.1. Summarization 103
6.2. Constructional plan 103
6.3. Formwork project 112
6.4. engineering of reinforcing steel bar 116
6.5. Production of concrete 118
6.6. Control of the temperature of concrete 126
6.7. Prefabricated concrete 129
6.8. Module-bag concrete 131
7. Construction of Masonry Engineering 136
7.1. Working items 136
7.2. Engineering volume of main projects (see Table 7-1) 136
7.3. Masonry engineering 137
8. Engineering construction for foundation treatment 147
8.1. Consolidation grouting and curtain grouting 147
8.2. Construction of high-spray seepage control wall 154
8.3. Construction of pile foundation 158
8.4. Contact grouting and joint grouting 164
9. INSTALLATION OF METAL STRUCTURES AND HOISTING EQUIPMENT 168
9.1. Temporary facilities and plane layout for site construction 168
9.2. Installation Construction project of and installation preparation for metal structures and hoisting equipment 168
9.3. Installation solution of metal structures and hoisting equipment 171
9.4. Instructions about hoist installation technology and scheme 184
9.5. Installation of Hoist electrical equipment 191
9.6. Training of the Operation and maintenance personnel of the employer 198
9.7. Quality Check and acceptance 199
10. ANALYSES OF AND COUNTERMEASURES FOR KEY POINTS OF THE CONSTRUCTION TECHNOLOGIES 200
10.1. Control of construction schedule 200
10.2. Construction of silica-powder concrete 202
10.3. Construction during typhoon and rainy seasons 204
10.4. Control of concrete appearance qualities (CAQ) 205
11. PLANNING OF CONSTRUCTION MASTER SCHEDULE 211
11.1. Instructions on compiling construction master schedule planning 211
11.2. Construction master schedule planning crossing diagram (see attached drawings) 218
11.3. Construction master schedule planning network diagram (see attached drawings) 218
11.4. Table for the planning of consumption of main materials 219
11.5. Table of manpower planning 220
11.6. Guarantee measures for working schedule 221
12. SUMMARY TABLE OF MAJOR CONSTRUCTION MECHANICAL EQUIPMENT 225
13. Quality guarantee measures and q

奖励      

  • 奖励于 2006-04-07 21:08:05

 发表于2012-08-13   |  只看该作者      

5

这个绝对是好东西